We worked on "The Old Dutch Sloop" which is about the sailboats that went up and down the river and helped get from one side of the river to the other. The song is also about Robert Fulton's steamboat and how it changed the way the ships went up and
down the river even faster and, as the song says' "The Dutch Sloop died".
Producer Casey Biggs conducting the singers
Director David Little staging "The Old Dutch Sloop"

No comments:
Post a Comment